Skip to content
MicroinverterAcademy
Lesson 4.4preview: 7:49full lesson: 20 min

Grid profile: who chooses it, and how to check it in the app

The datasheet window, the utility's choice under IEEE 1547-2018 and UL 1741 SB, Rule 21, Hawaii and New York, the wait before producing, the selector of the ECU, 208 V or 240 V, and the check in six steps.

What to keep from the lesson. Page numbers in the sources are the PDF pages of each document.

What this lesson solves

  • The datasheet window is the continuous band of IEEE 1547-2018 Category III and Rule 21; note (1) lets the utility extend it.
  • The utility chooses the settings, as guided by the authority governing interconnection; in Hawaii, the latest URP of Hawaiian Electric sets the defaults, other settings by mutual agreement.
  • Select the grid profile when installing: Workspace, Grid Profile, North America, US and the profile. The name proves nothing; its values do.
  • Measure before you pick: the 240 V window starts at 211 V, above the 208 V nominal. With a 240 V setting on a 120/208 V service, the micros trip at the nominal voltage.
  • The wait before producing is the one in the profile the utility requires. Wait out that delay before looking for faults.

The numbers in this lesson, with sources

WhatValueFact
DS3 window at 240 V211 V to 264 V3.2
DS3 window at 208 V183.04 V to 228.8 V3.2
Frequency range58.8 Hz to 61.2 Hz; HECO: 57 Hz to 63 Hz3.4

Each value comes from the course fact base, with the document page or the code section on record.

Chapters

  1. Intro0:00
  2. 1The window on the datasheet1:21
  3. 2Who chooses the profile2:55
  4. 3Rule 21, Hawaii and New York4:55
  5. 4The wait before producing7:25
  6. 5Where the profile is chosen8:34
  7. 6Two-oh-eight or two-forty: measure first10:49
  8. 7How the profile is checked12:41
  9. 8Power factor and one profile per system14:28
  10. 9Wrong profile, system down15:25
  11. 10The common mistake17:14
  12. 11Quick check17:54
  13. 12Checklist and next lesson18:20

Preview transcript

919 words

This is the text of the open part of this lesson. The full transcript comes with the course, along with the job site materials.

Intro

0:00

Main breaker on, micros dark. Right away, the homeowner calls: the system is broken. Nothing's broken. The micros are waiting, and the profile the utility asked for sets how long. Hi, I'm Sol. This is lesson four point four, in the communication and commissioning module. And I'm Helios. Today's question comes from every job: which grid profile goes on a DS3 in the U.S.? Today's documents: the DS3 Series datasheet, the ECU-R and EMA Manager manuals, and the rules utilities publish. And you read the profile's values on the ECU screen, never from memory. By the end of this lesson, you'll pick and check the grid profile without guessing and without copying. The grid profile is what the manual tells you to select when you install the system. It's not a preference. We start with the datasheet, which states the voltage and frequency window. Then who chooses, the rules by state, the wait, the selector, the measurement, the check, and what happens when it goes wrong.

The window on the datasheet

1:21

Chapter one. DS3 Series datasheet, revision two point three, page two. Output data. Nominal voltage: two hundred forty volts, with a range of two eleven to two sixty-four. And two-oh-eight nominal, from one eighty-three point oh four to two twenty-eight point eight volts. And the frequency? The grid moves both ways. Sixty hertz, with a range of fifty-eight point eight to sixty-one point two. And in parentheses, Hawaiian Electric: fifty-seven to sixty-three hertz. Six limits on two lines. Do they leave the factory fixed like that? No. Same page, note one, at the foot of the table. The nominal voltage and frequency range can be extended beyond nominal, if required by the utility. The utility. That word runs this whole lesson. And our reading of the window: two eleven to two sixty-four is zero point eight eight to one point one oh of two-forty. That's the band where the twenty eighteen IEEE 1547, Category three, and Rule twenty-one keep the inverter in continuous operation. Same for the frequency: fifty-eight point eight to sixty-one point two hertz is their continuous band. So the datasheet window is the band where the micro runs continuously, under the default rules.

Who chooses the profile

2:55

Chapter two. Who chooses the settings? The utility, which the standard calls the Area EPS Operator. As guided by the authority over interconnection: a commission, a city, or a co-op, which can hand it to the utility. In Minnesota, the utility assigns category A or B, and the commission assigns category one, two, or three. AEP requires Category three, as amended. Under Rule twenty-one, the defaults change only by agreement between customer and utility. And in Hawaii, Hawaiian Electric's required profile sets the defaults. And the A, B, one, two, three. What do they mean? The twenty eighteen IEEE 1547 has two families. Normal performance, categories A and B: reactive power and voltage regulation. Abnormal performance, categories one, two, and three: ride-through and trip. Three adds ride-through for high penetration. And where does UL 1741 SB come in? It's the product test that evaluates compliance with the twenty eighteen IEEE 1547, with an interoperability test. That's how the California utilities put it. The series certificate, page two: grid support verified to UL 1741 SB, with the twenty eighteen IEEE 1547 and Hawaiian Electric's source requirements. And to UL 1741 SA, with California's Rule twenty-one. So the certificate proves the type tests. The setting on my job, I prove on the screen. Exactly. Utilities started requiring SB in twenty twenty-three: Hawaii, Massachusetts, New York, and later P G and E.

Rule 21, Hawaii and New York

4:55

Chapter three. Each utility writes its own list. California first: P G and E's Rule twenty-one. Harmonized with the twenty eighteen IEEE 1547. Its smart inverter section covers inverters under UL 1741 SB, and its trip defaults equal Category three. Enabled by default: anti-islanding, ride-through, Volt-VAR, ramp rates, soft-start, frequency-watt, and Volt-Watt. Disabled by default: fixed power factor and constant reactive power. And Hawaii, which shows up right on the datasheet? Hawaiian Electric's source requirements, version two point zero, require Category B and Category three. And they widen frequency ride-through: continuous operation from fifty-seven to sixty-three hertz. That's the Hawaii line of the datasheet. Under Rule fourteen H, Hawaiian Electric's required profile sets the defaults. Volt-Watt and Volt-VAR on, constant power factor off. And is the DS3 on their list? On the qualified list updated August fourteenth, twenty twenty-six: the four models, with firmware version five or higher. And Hawaiian Electric asks manufacturers for screenshots of the default settings, so installers like me can prove compliance. And the Northeast? Massachusetts and ISO New England: UL 1741 SB, Category three, unity power factor, Volt-VAR and Volt-Watt off. New York goes utility by utility. Con Edison: Volt-VAR on, Volt-Watt off. National Grid: Volt-VAR off below fifty kilowatts. Central Hudson: Volt-VAR on, Volt-Watt off. Volt-VAR on in one city, off in the next state. There's no national answer. And elsewhere: Otter Tail, both on. AEP, both off, with unity power factor. And in Texas, Oncor's application form asks for UL 1741 and the applicable parts of IEEE 1547. So the rule is the utility's document for that address. Never the profile from the last job.

The wait before producing

7:25

Chapter four. The wait, from lesson three point four. After the branch breakers and then the main come on, the micros wait before producing. How long depends on the profile the utility requires. The twenty eighteen IEEE 1547 defaults, as AEP and Massachusetts publish them: a three hundred second delay, then a three hundred second ramp.

After this lessonThe full course: 27 lessons in the order of the job

Job site materials in every lesson, questions inside the video, spaced review, a final exam and a certificate of completion with a public verification code. 7 days to cancel, with a full refund.