Mounting to the racking: the hardware that comes from the racking maker
The M8 hardware the quick guide names, the torque from the racking manual, and the AC cable that is not a handle.
What stays from the lesson, to keep at hand before the first bolt. The page numbers in the sources are the PDF pages of each document.
What this lesson solves
- The micro mounts to the rail with M8 hardware not supplied by APsystems, the hardware your module racking vendor recommends. It goes on the material list, because it is not in the micro's box.
- The torque belongs to the racking maker, in the racking manual. The torques APsystems publishes for this installation are the end cap nut, 4 to 5 N·m (about 35 to 44 lbf·in), and the screws on the field connector drawing.
- On a US roof the attachment follows the racking manual: hole, screw, embedment, flashing and torque. Every roof penetration is flashed and sealed, and the roof is designed for dead load, snow and wind.
- Carry the micro by the case, never by the AC cable: the cable can partly or fully disconnect from the unit, and the micro then runs poorly or not at all.
- Mounting already gives part of the ground: on a grounded rack, the micro's grounding washer bonds the micro to the rack, and the other way around. The racking is grounded per local code; the details are in lesson 1.3.
The numbers in this lesson, with sources
| What | Value | Fact |
|---|---|---|
| Width x height, every model | 10.3 in x 8.6 in (263 mm x 218 mm) | 4.4 |
| Depth: DS3 and DS3-H / DS3-S and DS3-L | 1.7 in (42.5 mm) / 1.6 in (41.2 mm) | 4.4 |
| Weight: DS3-S, DS3-L and DS3 / DS3-H | 6.2 lb to 7.1 lb (2.8 kg to 3.2 kg) / 7.1 lb (3.2 kg) | 4.5 |
| Mounting slot on the drawing | 8.4 mm, for the M8 bolt | 4.14 |
| End cap nut torque, not the mounting bolt | 4 to 5 N·m (about 35 to 44 lbf·in) | 8.9 |
| US single-family detached homes: shingle / metal / tile | 79.9 % / 7.6 % / 6.7 % | 21.1, 21.7 |
Each value comes from the course fact base, with the document page or the code section on record.
Chapters
- Intro0:00
- 1The unit in your hand1:18
- 2Where it mounts3:47
- 3The torque belongs to the racking maker5:35
- 4Shingle, metal and tile7:20
- 5The series side by side9:01
- 6The cable is not a handle9:58
- 7What mounting already solves10:54
- 8The common mistake12:07
- 9Quick check12:41
- 10Checklist and next lesson13:11
Preview transcript
784 wordsThis is the text of the open part of this lesson. The full transcript comes with the course, along with the job site materials.
Intro
0:00Hot roof, rails up, and the micro coming up on a handline to its spot. Up to seven point one pounds in your hand, and one question: what bolt holds it? Hi, I'm Sol. This is lesson one point two, on mechanical installation. And I'm Helios. I bring the bolt that never makes it onto the material list. The topic is mounting the DS3 to the racking, and that bolt is not supplied by APsystems. Quick guide, user manual, and datasheet: the three US documents of the series. By the end of this lesson, you'll know what holds the micro and who sets the torque. And I want to know whose number that is: the micro's, or the racking's. We'll get there. Plus how to carry the unit, and it's never by the AC cable. Where do we start? The unit, or the hardware? The unit. Size and weight change how you carry it up and where it goes. Then the hardware, the torque, the roof, the whole series, the cable, and what mounting already solves.
The unit in your hand
1:18Chapter one. The DS3 Series datasheet for the US, revision two point three, page two. Width by height: ten point three by eight point six inches, the same on every model of the series. That wide, it fights for space with the module's junction box. Depth: one point seven inches on the DS3, and one point six on the DS3-S and the DS3-L. Weight: the three models share one range, six point two to seven point one pounds. Times the number of units, that becomes load on the racking and on your shoulder. Each micro takes two modules, so that's one attachment point every two modules. Page three is the DS3-H: same width and height, one point seven inches deep, seven point one pounds. Its own datasheet, from February twenty twenty-five, says six point eight. Same question as lesson zero point two: which one goes in the plan? The newer revision governs. The series datasheet and manual of December twenty twenty-five say seven point one. So seven point one pounds goes on the job sheet for the DS3-H. The accessories summary adds the drawing: a mounting slot eight point four millimeters wide, made for the M eight bolt. With the mounting plate, the height grows to two hundred sixty-eight millimeters. The case alone is two hundred eighteen. And the depth on this drawing reads thirty-seven millimeters. The user manual's drawing, page twenty-seven, reads thirty-six point five to forty-two point five. Three numbers for one depth, like in lesson one point one. Which one do I plan with? Same answer as last lesson: the datasheet's, the largest. One point seven inches, or forty-two point five millimeters. And the datasheet rates the enclosure Type six. Type six is not a pass to leave it in the sun. Where it sits is lesson one point one. Four lines from the datasheet and the drawings, four decisions on the way up and on the rail. That table goes in the job folder. It tells you how many hands go up the ladder.
Where it mounts
3:47Chapter two. The DS3 Series quick installation guide, revision four point zero, page one. Step three: attaching the microinverters to the racking. This is where jobs get stuck. The guide's drawing shows the hardware, and it's an M eight. Right under the drawing, the manufacturer's note, word for word: M eight, not supplied by APsystems. So the bolt that holds the micro is not in the micro's box. It isn't. And the step says to use the hardware recommended by your module racking vendor. The same step is in the user manual, page eleven, with two lines and a warning. One: mark the location of each micro on the rack, relative to the module junction box or any other obstruction. Two: install one micro at each mark, using the hardware your racking vendor recommends. Three: micros and connectors go under the modules, out of rain, UV, and bad weather. Four: three-quarters of an inch below and above the case, and the racking grounded per local code. Two lines, one warning, and not a word about torque. Not a word, because the bolt isn't theirs. Chapter three shows whose it is. Here's the manual's own figure for that step: M eight, not supplied by APsystems. Three drawings: the bolt in the rail, the slot of the mounting plate over the bolt, and the micro on the rail. And one house rule at this step: as each micro goes on the rail, its serial label goes on the installation map.
The torque belongs to the racking maker
5:35Chapter three. User manual, page nine, section four point two. The title says it all: other required accessories not supplied by APsystems.