Who can install, PPE, tools and what the manufacturer supplies

The qualified person of the manual and the NEC, state licenses, the OSHA rules this course doesn’t replace, and the job material APsystems doesn’t supply.

What stays from the lesson, to keep at hand before the crew leaves. The page numbers in the sources are the PDF pages of each document.

What this lesson solves

  • Only qualified professionals install or replace the micro, in the manual's words, and the NEC asks for qualified persons: competence and safety training. Licenses come from state and local law, and this course does not grant one.
  • Falls, by OSHA: protection from 6 ft in residential construction and from 4 ft in general industry, which covers maintenance. An identical warranty swap is maintenance; when in doubt, the house applies the stricter rule.
  • At the panel, a circuit not locked and tagged counts as energized. Disconnect every source, release stored energy, lock and tag, then a qualified person tests, backfeed included.
  • APsystems supplies the trunk cable, the end cap, the Y-CONN cap, the unlock tool, the ECU and the AC connectors, ordered by part number. The junction box, the mounting hardware and the wrenches are not supplied, and the M8 torque is the racking maker's.
  • Low voltage is not low risk: the body reaches 80 °C (176 °F), the unit is never opened, and installation carries the risk of electric shock, the PV array included, once the system is connected to the grid.

The numbers in this lesson, with sources

WhatValueFact
Fall protection, residential constructionfrom 6 ft above lower levels19.4
Fall protection, general industry (maintenance)from 4 ft19.9
Anchorage and free fall, personal fall arrest5000 lb per person; free fall of 6 ft at most19.6
Rubber insulating gloves, Class 00 / Class 0500 V AC / 1000 V AC; tested every 6 months19.17
Body of the microup to 80 °C (176 °F)4.11
End cap nut torque4 to 5 N·m (about 35 to 44 lbf·in)8.9

Each value comes from the course fact base, with the document page or the code section on record.

Chapters

  1. Intro0:00
  2. 1Who can install1:20
  3. 2Licenses: your state and your AHJ3:04
  4. 3Falls: what OSHA asks4:43
  5. 4At the panel: lockout and NFPA 70E6:26
  6. 5PPE and tools8:17
  7. 6Credentials: NABCEP and the APsystems Academy10:02
  8. 7The risk that stays12:11
  9. 8What APsystems supplies13:52
  10. 9What comes out of your pocket15:22
  11. 10The two serial labels16:50
  12. 11Receiving the shipment17:50
  13. 12The real order of the job18:44
  14. 13The common mistake19:26
  15. 14Quick check20:08
  16. 15Checklist and next lesson20:34

Preview transcript

1113 words

This is the text of the open part of this lesson. The full transcript comes with the course, along with the job site materials.

Intro

0:00

Truck loaded, crew on the roof, and no junction box to close the branch. The manual lists, in three lines, the items that don't come from APsystems. Hi, I'm Sol. This is lesson zero point five, still before the job. And I'm Helios. Today's question is who goes up on the roof, and what they carry. This lesson covers competence, licenses, safety rules, tools and job material. With the document page on screen, as always. By the end, you'll know who the manual and the code allow to install and replace the equipment. And I want to leave with the right shopping list, with no surprises on the roof. You will. And with both serial labels peeled off before the module covers the micro. Then start with who can touch the equipment. Here's the route. Who installs, licenses, falls, the panel, PPE and tools, and the credentials. Then the risk that stays, what APsystems supplies, what you buy, the labels, receiving, and the job order.

Who can install

1:20

Chapter one. The user manual for North America, revision two point three, page three, safety instructions. The second line: only qualified professionals should install and/or replace APsystems microinverters. Is that the manufacturer's suggestion, or a requirement? It's the manual's wording. And the code says listed equipment is installed and used per its instructions. The next line: perform all electrical installations in accordance with local electrical codes. So the manufacturer has a say, and so does the local code. Page nine, where the installation chapter opens, and the rule comes back. Installation must comply with local regulations and technical rules. And point two of the warning repeats it: only qualified professionals install or replace. On page five, the manual defines a qualified person. Someone familiar with safety, electrical system and EMC requirements, and authorized to energize, ground and tag equipment. Qualified person. The NEC uses the same term. The NEC says it plainly: PV equipment and its wiring are installed only by qualified persons. A qualified person has skills and knowledge of the equipment, and has received safety training to recognize and avoid the hazards. And does that call for a license? That's competence and training. Licenses come from state and local law, and that's the next chapter.

Licenses: your state and your AHJ

3:04

Chapter two. In the US, licenses change by state, by city and by type of work. California: a C-forty-six solar contractor, or a C-ten electrical contractor, whose electricians must be certified electricians. Texas: electrical work needs a license issued or recognized under the state's occupations code. Florida: a solar contractor, or a contractor of another class when the work falls within its own license. And New Jersey? I heard that even handling panels there needs a license. Its rule, adopted in twenty fifteen: installing, servicing and handling exposed panels and inverters is only for a licensee with a business permit, or an employee. Arizona asks for a licensed solar contractor, who also evaluates the roof before the first installation. And in New York City, PV installation is done only by licensed master electricians or licensed special electricians. So the license depends on where the job is. And so does the permit. California's automated permitting, for example, issues permits to a licensed contractor. The AHJ, the authority having jurisdiction, interprets the code and approves equipment for the job. One rule, plain and simple: this course does not grant a license. Check your state and your AHJ. Clear. The license belongs to the state. The training is on you.

Falls: what OSHA asks

4:43

Chapter three. The source changes: no longer the manufacturer, but federal OSHA, Title twenty-nine of the CFR. OSHA itself separates two cases: installing solar panels is construction, and maintaining them is general industry. And on a house roof, from what height? In residential construction, from six feet above lower levels: guardrails, a safety net, or a personal fall arrest system. In maintenance work, under the general industry rules, the trigger is four feet. And a state with its own OSHA State Plan runs its own fall protection program, at least as effective as the federal one. And a warranty swap? Same micro, same spot. For OSHA, an identical swap is maintenance; a new system or a model change is construction. When in doubt, we apply the stricter rule. On a steep roof, more than four in twelve, the same three systems apply from six feet. And the personal fall arrest system has numbers of its own. An anchorage of at least five thousand pounds per person, or one designed with a safety factor of two under a qualified person. Free fall of no more than six feet, and a body belt is prohibited for fall arrest. And the training? The employer trains every exposed worker through a competent person, and keeps a written certification record. On the ladder: side rails at least three feet above the landing, and never climb carrying a solar panel.

At the panel: lockout and NFPA 70E

6:26

Chapter four. At the panel, OSHA's construction rule: nobody works close enough to touch a circuit unless it's de-energized and grounded, or guarded. And under OSHA's general industry rule, which the house follows on every job, a circuit off but not locked and tagged counts as energized. The order matters. Disconnect every source, release stored energy, lock and tag, then test. Lock and tag before the test. Not the other way around. And the test is done by a qualified person, with test equipment, including for backfeed. On a construction site, tags go at every point where the circuit can be energized. And when the work is done? Tools, jumpers and temporary grounds removed, everyone warned to stand clear, and each lock removed by the person who put it on. And NFPA 70E. The NFPA lists the twenty twenty-seven edition as current. Its cornerstone is the electrically safe work condition: identify the sources, open the disconnects, lock and tag, and verify the absence of voltage. And personal protective equipment is the last line of defense, inside the employer's electrical safety program. And the approach distances, the arc-flash categories? Those come from the current edition and from your employer's electrical safety program. House rule: this course covers safety basics. It does not replace the OSHA ten-hour construction course. Nor the employer's fall protection training, the written lockout procedures, or the training of qualified persons. So the employer's duties stay with the employer.

PPE and tools

8:17

Chapter five. Our minimum PPE for the roof and the panel. Hard hat, safety glasses, safety footwear and work gloves. A full-body harness, a shock-absorbing lanyard and an anchorage rated for the load, or guardrails, where the fall rules apply. And near anything live: rubber insulating gloves rated for the voltage, with leather protectors, insulated tools and no jewelry.

After this lessonThe full course: 27 lessons in the order of the job

Job site materials in every lesson, questions inside the video, spaced review, a final exam and a certificate of completion with a public verification code. 7 days to cancel, with a full refund.