What this lesson solves
- The home run from the junction box to the panel is your conductor, sized by the code; the trunk's drawing numbers belong to the trunk.
- Measure line to line and to neutral before you choose the model, the branch count and the profile: "single-phase" can be 240 V or 208 V.
- Two gates: the AHJ's approval and the utility's written PTO. Normal operation only after both.
- Lock, tag and verify the absence of voltage before you connect; then the re-energizing check, each branch breaker, the main, and the profile's wait.
The numbers in this lesson, with sources
| What | Value | Fact |
|---|---|---|
| DS3 window at 240 V | 211 V to 264 V | 3.2 |
| DS3 window at 208 V | 183.04 V to 228.8 V | 3.2 |
| DS3 output current, 240 V and 208 V | 3.7 A and 4.2 A | 3.3 |
Each value comes from the course fact base, with the document page or the code section on record.
Chapters
- Intro0:00
- 1Extending the AC side1:28
- 2Which service is this3:39
- 3The range of the service6:54
- 4Services that don't fit, and three-phase buildings8:52
- 5The order: connect and disconnect10:08
- 6Two gates: the inspection and the PTO11:29
- 7Energizing, step by step13:45
- 8The common mistake16:55
- 9Quick check17:28
- 10Checklist and next lesson18:00
Preview transcript
1018 wordsThis is the text of the open part of this lesson. The full transcript comes with the course, along with the job site materials.
Intro
0:00The service was called single-phase, three-wire. Nobody measured it, and the system was quoted for two-forty. On energizing day, the meter read two-oh-eight between the lines. Same micro, another current, another count per branch. Hi, I'm Sol. This is lesson three point four, the last one on the AC side. And I'm Helios. Today I bring the service nobody measured, and the order to energize. Three topics close the module: the AC extension, the service the utility delivers, and energizing. By the end, you'll extend the AC side to the panel, and know which rules the home run follows. And I'll measure the service before choosing the model and the profile: between the lines, and each line to neutral. And you'll energize in the manual's order, with lockout and tagging, and only after the inspection and the PTO. Where do we start? With the extension and the home run. Then the service: two-forty or two-oh-eight, its range, and three-phase buildings. And then the order: connect and disconnect, the two gates, and energizing step by step.
Extending the AC side
1:28Chapter one. DS3 Series user manual, page fifteen, step nine: the AC extension cable. When an AC extension cable is needed, the trunk cable and the extension meet inside a junction box. Or through a pair of male and female AC connectors, which APsystems offers as optional accessories. The junction box is bought for the job. APsystems doesn't supply it. House rule from lesson three point one: an outdoor-rated junction box at the array, with entries from below, where the trunk cable meets the home run. The trunk cable stays on the array, secured to the rail, never resting on the roof. From the box to the panel, conduit. And the free end of the trunk cable? Accessories summary, page three: at the free end, the bus cable end cap, or a female end connector with one more micro on it. That female end connector is rated twenty-five amps, and it only carries the micro plugged into it. So the end connector doesn't limit the branch. The trunk cable's own rating does. And the extension to the panel, the home run, follows different rules from the trunk cable. The trunk cable is the maker's listed cable: twenty-eight amps on twelve AWG, and thirty-five on ten AWG, on its drawings. The home run is your conductor: its ampacity with sixty-degree terminals, corrected for temperature, sized like any branch circuit. And the breaker never passes the cap for the wire size: twenty amps on twelve AWG, thirty on ten AWG. Two forty point four D: the same values in the twenty seventeen, twenty twenty-three and twenty twenty-six editions. So the drawing's numbers belong to the trunk cable, never to my home run. The full math is in lesson three point two. Here, the rule: each piece by its own number, and the lowest one governs.
Which service is this
3:39Chapter two. The manufacturer's document steps aside, and the utility comes in. PG&E's service rules, for example. Single phase, three-wire: one-twenty, two-forty volts, or one-twenty, two-oh-eight volts. Two services under the same name? Where does the two-oh-eight come from? From a three-phase system. One-twenty, two-oh-eight single phase is two lines of a two-oh-eight wye, one-twenty system. Between the two lines, two-oh-eight volts. From each line to neutral, one-twenty. Xcel serves it only from a three-phase transformer. On a split-phase service: between the two lines, two-forty. From each line to neutral, one-twenty. And the customer calls both of them single-phase. That's why the name doesn't tell you the voltage. Single-phase, three-wire can be either one. And never call it two-phase, or the two-twenty. Two-twenty is not a US residential voltage. House rule: measure between the two lines and from each line to neutral, before you choose the model and the profile. Close to two-forty and one-twenty: split-phase. Close to two-oh-eight and one-twenty: a two-oh-eight wye service. The manual starts right there. Page eleven, step one: verify that the grid voltage matches the microinverter rating. And the DS3 runs on both services? It does. Datasheet, page two: the series is rated at two-oh-eight and at two-forty, line to line. The window at two-forty: two eleven to two sixty-four volts. At two-oh-eight: one eighty-three point oh four to two twenty-eight point eight. The NEC rule behind it: the voltage rating of equipment can't be less than the nominal voltage of its circuit. So the DS3 Series never goes on a two seventy-seven or a four eighty circuit. And one-twenty is below its datasheet window. And what changes at two-oh-eight? The current. The DS3 keeps eight hundred eighty volt-amps at both voltages, so at two-oh-eight each unit carries more. Four point two amps at two-oh-eight, against three point seven at two-forty. So the branch takes fewer micros: three instead of four on twenty amps, five instead of six on thirty. The DS3-H is rated nine sixty volt-amps at two-oh-eight and ten fifty at two-forty. It keeps three and five, at both. And the grid profile is chosen for the measured voltage. A two-forty setting on a two-oh-eight service trips the micros at normal voltage. Because the two-forty window starts at two eleven, above the two-oh-eight nominal. They run only while the service sits above two eleven. How to choose and check that profile is lesson four point four.
The range of the service
6:54Chapter three. The grid doesn't deliver one fixed number. PG&E keeps service voltage at two twenty-eight to two fifty-two on a two-forty service. And one ninety-seven to two eighteen on two-oh-eight, under normal load. PacifiCorp publishes ranges consistent with ANSI C eighty-four point one, Range A and Range B. On a one-twenty, two-forty service, Range A runs from two twenty-eight to two fifty-two, and Range B from two twenty to two fifty-four. On two-oh-eight, Range A from one ninety-seven to two eighteen, and Range B from one ninety-one to two twenty. And does the DS3 window hold all of that? House calculation: the datasheet windows contain Range B with margin, at both voltages. Texas asks its utilities to follow ANSI C eighty-four point one. Florida: no more than five percent above or below the standard voltage.
Job site materials in every lesson, questions inside the video, spaced review, a final exam and a certificate of completion with a public verification code. 7 days to cancel, with a full refund.