What this lesson solves

  • The proof of the listing is the CSA certificate 80069963, issued December 31, 2024 to the manufacturer: the DS3-H, DS3, DS3-L and DS3-S, to CSA C22.2 No. 107.1 and UL 1741, third edition.
  • Grid support on page 2 of the certificate: UL 1741 SA with the Rule 21 source requirements, and UL 1741 SB with IEEE 1547-2018 and Hawaiian Electric SRD-V2.0; interoperability with IEEE 2030.5.
  • Rapid shutdown, in the course's words: “rapid shutdown per NEC 690.12, 2014 to 2023 editions, per CSA certificate 80069963”, with the certificate on screen. The 2023 edition is the last one the series papers name.
  • Three layers, three rules: the installation follows the NEC edition the AHJ enforces; the equipment proves its listing to UL 1741; grid behavior follows the IEEE 1547-2018 settings the utility requires, proven by UL 1741 SB.
  • The radio holds FCC equipment authorization: FCC ID 2AFGR-DS3, granted September 15, 2021, before the FCC Covered List of July 28, 2026.

The numbers in this lesson, with sources

WhatValueFact
Series certificatecCSAus 80069963, issued December 31, 20245.4
Rapid shutdown editions on the certificateNEC 2014, 2017, 2020 and 2023, 690.125.5
DC arc-fault threshold, NEC 690.1180 V DC or greater9.18
Maximum input voltage of each DS3 input60 V2.2
FCC ID of the radio2AFGR-DS3, granted September 15, 20215.24
Firmware updates for authorized invertersallowed at least until January 1, 20295.29

Each value comes from the course fact base, with the document page or the code section on record.

Chapters

  1. Intro0:00
  2. 1What the datasheet says1:38
  3. 2The series certificate3:18
  4. 3Who holds the listing5:09
  5. 4Who enforces what6:31
  6. 5What the certificate does not prove8:29
  7. 6Rapid shutdown and arc-fault9:36
  8. 7The radio12:02
  9. 8The common mistake13:37
  10. 9Quick check14:11
  11. 10Checklist and next lesson14:43

Preview transcript

769 words

This is the text of the open part of this lesson. The full transcript comes with the course, along with the job site materials.

Intro

0:00

Permit review in a state on the twenty twenty-six NEC. The plan reviewer asks how the micros meet rapid shutdown. I open the series certificate: six ninety point twelve, up to the twenty twenty-three edition. Now what? Hi, I'm Sol. This is lesson zero point three. And I'm Helios. In Texas, Oncor's interconnection application asks for UL 1741 and the applicable parts of IEEE 1547. Today's topic is compliance: the listing of the series, the standards behind it, the radio, and what each paper proves. Which paper counts, and who holds it. By the end of this lesson, you'll know what the series certificate proves, and what it does not prove. And how to state rapid shutdown with the editions the certificate lists. Everything comes from the datasheet, the manuals, the certificate, the FCC papers, and the code the AHJ enforces. One note first: this course is independent, built on the manufacturer's documents. It is not an APsystems course. Where do we start? With the code, or with the paper? With the datasheet. Then the certificate, who holds it, and which rule covers what. And at the end, what it does not prove, rapid shutdown and arc-fault, and the radio.

What the datasheet says

1:38

Chapter one. Datasheet, revision two point three, page two, the compliance line. UL 1741, a CSA standard, FCC Part fifteen B, IEEE 1547, and UL 1741 SB. And two code sections, for the twenty fourteen to twenty twenty-three editions: six ninety point eleven and six ninety point twelve. And that CSA standard? That one isn't from our code. Right. The CSA standard is the Canadian side of the same listing. In the U.S., the listing is to UL 1741. And ICES-003 is the Canadian counterpart of FCC Part fifteen B. Both are on the lab statement in chapter seven. Now a detail. Page one, in the bullets: California's Rule twenty-one, under UL 1741 SB. Page two, in the table: Rule twenty-one, under UL 1741 Supplement SA. Same datasheet, two supplements. And the manual, page eight, says SA, and rapid shutdown for the twenty twenty edition. And page ten says twenty fourteen and twenty seventeen. These texts are older and incomplete. They don't conflict with the datasheet. The outcome: the certificate decides. It lists both supplements, and rapid shutdown up to twenty twenty-three.

The series certificate

3:18

Chapter two. The proof of the listing is the CSA certificate of compliance of the series. Certificate eight zero zero six nine nine six three, issued on the last day of twenty twenty-four. And a copy I saved last year still counts? Check the U.S. library for a newer version, and open the file before you send it. This one is an example, with its date. If the file carries another certificate number, it is not the series certificate. The series one is eight zero zero six nine nine six three. Products: grid support utility-interactive microinverter, models DS3-H, DS3, DS3-L, and DS3-S, rack mounted. So one certificate for the four models. Applicable requirements: the CSA standard for power conversion equipment, and UL 1741, third edition, dated May nineteenth, twenty twenty-three. The note under it: that third edition includes IEEE 1547, the twenty eighteen edition among them. Page two, grid support: verified to UL 1741 Supplement SA, with the source requirements of California's Rule twenty-one. And to UL 1741 SB, with the twenty eighteen IEEE 1547 and Hawaiian Electric's source requirements, version two point zero. Plus interoperability, verified with the IEEE twenty thirty point five protocol. Six things to read on the certificate: number and date, holder, models, requirements, grid support, and rapid shutdown.

Who holds the listing

5:09

Chapter three. Same certificate, the issued-to block: Altenergy Power System, in Jiaxing, China. The manufacturer. And the U.S. side? The limited warranty comes from Altenergy Power Systems U.S.A. The listing belongs to the manufacturer, not to the installer and not to the distributor. And the CSA mark with the C and the U S indicators covers Canada and the U.S. The datasheet prints it too: it meets the standard requirements for distributed energy resources, and it carries the CSA listed mark. Does that change anything on my job day? It does. The twenty seventeen NEC asks for inverters listed or field labeled for the PV application, and interactive equipment listed or field labeled for interconnection. And listed equipment is installed by the instructions in its listing. That's one-ten point three B. The twenty twenty-four residential code says the same: inverters listed and labeled to UL 1741, and listed for utility interaction. And who decides that the equipment is approved? The AHJ, the authority having jurisdiction. It interprets the code and approves equipment and materials.